翻訳と辞書
Words near each other
・ Rivers State Ministry of Energy and Natural Resources
・ Rivers State Ministry of Environment
・ Rivers State Ministry of Finance
・ Rivers State Ministry of Health
・ Rivers State Ministry of Information and Communications
・ Rivers State Ministry of Justice
・ Rivers State Ministry of Local Government Affairs
・ Rivers State Ministry of Power
・ Rivers State Ministry of Social Welfare and Rehabilitation
・ Rivers State Ministry of Special Duties
・ Rivers State Ministry of Transport
・ Rivers State Ministry of Urban Development
・ Rivers State Ministry of Water Resources and Rural Development
・ Rivers State Ministry of Works
・ Rivers State Ministry of Youth Development
Rivers State Monorail
・ Rivers State People's Democratic Party
・ Rivers State Police Command
・ Rivers State Road Traffic Management Authority
・ Rivers State Roads Maintenance and Rehabilitation Agency
・ Rivers State Senior Secondary Schools Board
・ Rivers State Sustainable Development Agency
・ Rivers State Television
・ Rivers State Tourism Development Agency
・ Rivers State Universal Basic Education Board
・ Rivers State University of Science and Technology
・ Rivers State Waste Management Agency
・ Rivers to Cross
・ Rivers Turnbull
・ Rivers Wash Over Me


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Rivers State Monorail : ウィキペディア英語版
Rivers State Monorail
The Rivers State Monorail (also known as Rivers Monorail and occasionally as Port Harcourt Monorail) is an under-construction monorail urban transportation project in Port Harcourt, Nigeria.
It will travel on a fully segregated, mostly elevated, right of way. The right of way will include two tracks, except for single-track sections at terminals and for one-directional loops. It is planned to use Intamin People Mover P30 rolling stock.
The initial route segment will go from Sharks Park to Waterlines, a distance of 5.4 km. Phase 1A of the project will extent from Sharks Park to UTC Station, while Phase 1B will extent the route further north to Waterlines. Further extensions are in planning phases.〔(【引用サイトリンク】title=Rivers Monorail | Allowing Faster Travel Time From Point to Point )
The decision to build the monorail was taken in 2009. In 2010, building of the project foundations began. The Government of Rivers State had in February 2013 announced that phase 1A and 1B of the monorail system would be completed during September that year. By 2014, monorail trains were performing test runs through UTC Station.〔(【引用サイトリンク】title=Stations | Filters | Rivers Monorail )
The Rivers Monorail will be using the Intamin P30 Monorail Train, an electric driven train especially designed and most suitable for commuter services in cities. It is the most recent model of its kind and characterized by modern design, spacious cabins and is equipped with large size door openings for easy access for passengers with luggage.
The train runs on the rubber wheels which are connected to bogies and is laterally guided by means of side guiding wheels. The interface between train and guideway is a rubber-steel interface which relates to a good friction coefficient which leads to decreased vibration transmitted to the train from the track. The aforementioned attributes leads to higher ride quality and passenger comfort.
One train will be in operation in Phase 1A, and six trains in Phase 1B.
A train will consist of seven individual cars. Six cars will carry passengers, and the seventh car will house the motors and electrical equipment. Driver’s cabins will be situated at each end of the train.
Passenger cars will feature safety and comfort systems. The air conditioning system is designed to provide a comfortable train interior, even if the outside temperature reaches 45 degree Celsius. Each train will be able to accommodate 172 passengers, with provision for 44 seated passengers included. One end car will have access for wheel chairs, and all cabin floors will be the same height as the station platforms to provide easy access for passengers with reduced mobility. Provision will be made for hand-held luggage only.The design operating capacity for Phase 1a is 1,200 passengers per hour. With a maximum operating speed of 70km/h, the train will travel between end stations in about 8 minutes. Six trains will have a design operating capacity of 2,700 passengers per hour. Train travel time between end stations will be about 22 minutes. Passengers can expect a train to stop at a station every 8 minutes.〔
In 2015, the LP Gubernatorial Candidate Tonye Princewill said he would cancel the system, he did lose the election receiving .86% of the vote.〔(【引用サイトリンク】 title=(untitled) )
In 2015, newly elected Rivers State Governor Ezenwo Nyesom Wike announce that the project would be reviewed.〔(【引用サイトリンク】title=Port Harcourt Monorail May Not Continue Says Wike | All You Need To Know )
== See also ==

* List of monorail systems

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Rivers State Monorail」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.